FLOWN Apollo 11 LM Lunar Surface Checklist. A single sheet approximately 5.5x8 inches, being pages 23 and 24 from the checklist. Page 23 lists the step by step procedures that Neil Armstrong and Buzz Aldrin used while inside the LM to configure S-Band communications and PCM (Pulse Code Modulation) equipment. The final steps on page 23 and the beginning steps on page 24, set the LM cabin and space suit equipment in the proper mode to allow the crew to begin a meal and rest period prior to the moon walk. Carried to the lunar surface and signed by Aldrin. NASA/MSC, June, July 1969
FLOWN Apollo 11 LM Lunar Surface Checklist. A single sheet approximately 5.5x8 inches, being pages 23 and 24 from the checklist. Page 23 lists the step by step procedures that Neil Armstrong and Buzz Aldrin used while inside the LM to configure S-Band communications and PCM (Pulse Code Modulation) equipment. The final steps on page 23 and the beginning steps on page 24, set the LM cabin and space suit equipment in the proper mode to allow the crew to begin a meal and rest period prior to the moon walk. Carried to the lunar surface and signed by Aldrin. NASA/MSC, June, July 1969
Try LotSearch and its premium features for 7 days - without any costs!
Be notified automatically about new items in upcoming auctions.
Create an alert